Solar Project
MES Airport Multan Solar Project
2.0 MW mission-critical solar power generation infrastructure for military and civil aviation facilities.
Plant Capacity2.0 MW
Enterprise ClientMES Airport Multan
LocationMultan
Commissioning Date2023-08

Solar Project
Project Overview & Execution
A high-security 2.0 MW solar installation adhering strictly to military engineering specifications (MES) and aviation safety standards, featuring anti-glare PV modules and fail-safe power synchronization.
Technical Scope Delivered
- Comprehensive electrical & structural engineering design adhering to PEC standards
- Procurement of Tier-1 components, certified string inverters, and high-yield arrays
- Complete on-site installation, cabling, civil footings, and grid synchronization
- Full load testing, harmonic inspection, and NEPRA-compliant commissioning
- Integration with cloud telemetry for 24/7 remote generation monitoring & fault logging
Installation Gallery

